Final Report On Technical Study Of Biogas Plants Installed In Bangladesh
The overall objective of the proposed study was to conduct a technical review of existing
biogas plants constructed across Bangladesh over the past years to facilitate the preparation
of implementation plan for the proposed National Domestic Biogas Programme. The field
study was carried out during the period September 03 to October 09, 2005 in 72 randomly
sampled biogas households from eight different districts representing all the six divisions in
Bangladesh. These plants were installed by BCSIR (61 nos.), LGED (7 nos.) and GS (5 nos.)
during the period 1997 to 2005. Analysis and interpretation of the result have been done with
the data and information from only 66 households as the six plants were feared to be outliers.